PROJECT
Anglicare
Replacement of sewer service damaged by tree roots
CLIENT
Anglicare
SERVICE
Sewer Replacement
LOCATION
Hopetoun RL, Castle Hill
TIMELINE
2022
PROJECT INFORMATION
Anglicare approached our team to address a pressing issue: the replacement of a sewer service damaged by tree roots. This problem posed concerns for health, safety, and operational disruption. The project's scope involved assessment, repair, and replacement of damaged sections with a focus on preventive measures. The expected outcome was the restoration of full sewer service functionality, ensuring the well-being of Anglicare's residents and the integrity of their property.
OBJECTIVES & PRIORITIES
Fit for Purpose
(compliant)
(compliant)
Cost
Savings
Savings
Quality
Workmanship
Workmanship
Tight
Deadlines
Deadlines
SCOPE OF WORKS
- Conducted a comprehensive on-site risk assessment to ensure the safety of personnel and the project environment.
- Implemented an exclusion zone with temporary fencing to safeguard the work area and prevent unauthorized access.
- Carried out precise service locating to identify and avoid potential underground services within the excavation area.
- Employed mechanical excavation methods to dig a trench measuring 22m x 1m - 1.5m deep efficiently.
- Removed and replaced 22m of 100mm earthenware pipework with new 100mm PVC pipework to enhance sewer system performance.
- Seamlessly connected three existing junctions to the new sewer line, ensuring optimal functionality.
- Supplied and installed two inspection openings raised to ground level, facilitating easy maintenance and monitoring.
- Backfilled the pipework with suitable materials and filled the trench with existing spoil, ensuring structural integrity.
- Conducted a thorough cleanup of the project site, leaving no debris or safety hazards behind.
- Provided a 3m skip bin for efficient removal of project-related waste materials.
- Supplied a 5-ton excavator for the project's duration, supporting excavation and construction activities.
- Replaced existing turf to restore the site's appearance and functionality.
KEY ACHIEVEMENTS
- Successful risk assessment and establishment of a secure work zone ensured safety throughout the project.
- Minimal disruption to residents.
- Mechanical excavation and replacement of damaged pipework with PVC improved sewer system reliability.
- Three existing junctions seamlessly connected to the new sewer line for smooth functionality.
- Thorough cleaning, proper backfilling, and waste management left the work area pristine.
- Turf relay enhanced the site's appearance and functionality, delivering a complete project.
RECENT PROJECTS
BLUE MOUNTAINS CITY COUNCIL New Sewer Connection
BLUE MOUNTAINS CITY COUNCILNew Sewer ConnectionView project
SCHOOLS INFRASTRUCTURE NSW Replacement of Defective Sewer Pipework
SCHOOLS INFRASTRUCTURE NSWReplacement of Defective Sewer PipeworkView project
THE PONDS VILLAGE Potable Water Main Installation
THE PONDS VILLAGEPotable Water Main InstallationView project